CAT. “Fusion” – 2022.03.29.
The pre-purchase survey was performed on board CAT. “Fusion” on 29.03.2022. at Marina Porto Montenegro,
The pre-purchase survey was performed on board CAT. “Fusion” on 29.03.2022. at Marina Porto Montenegro,
The pre-purchase survey was performed on board M.Y. “Alexander S” on 26.03.2021. at Marina Bonici,
The condition survey was performed on board M.Y. “Pasha” on 19.03.2022. at Marina Porto Montenegro,
The pre-purchase survey was performed on board M.Y. “THALIA” on 21.04.2022. at Marina Bonici, Tivat
The condition survey was performed on board M.Y. “Naos” on 18.02.2022. at Marina Trogir, Trogir
The pre-delivery survey was performed on board M.Y. “BETA” on 17.02.2022 at SACS shipyard, Milano
The pre-purchase survey was performed on board S.Y. “BOLERO” on 11.02.2022. at Marina Zelenika, Zelenika
The pre-purchase survey was performed on board CAT. “SIROCCOS” on 12.11.2021. at Marina Lefkas, Lefkada
The hull inspections include an assessment of the bottom condition, above and below the waterline
Initial Flag State Safety Inspection performed on commercial board the M.Y. PERTULA on 28.09.2021.